Layout and workshop engineering, static analysis, delivery and erection
400 m pedestrian walkway covering
180 tons metalwork with conic pipes, conic casted elbows, including 1.600 m² roof cladding form glass and fiber glass scobalit
Second Freeway, Taichung, Taiwan
Management and consulting
Ting Kau cable stay bridge, Hongkong
General detail drawings for the local workshop engineering by STIM, with coordination workshop/project engineering in Germany, modication of the factory (flow sheet and new equipment), quality and fabrication supervision in the factory in Shenzen, China