References
Selected examples of STIM projects
Procter and Gamble, Lagos, Nigeria
Layout and workshop engineering, static analysis, and delivery
steel structure: ~ 50 tons metal work and supervision of erection:
steel structure : ~ 1.500 tons
roof and wall cladding: ~ 31.500 m²
Stadium Porto Alegre for football world championship 2014, Brazil
Consulting for steel structure, the preassembly line and erection
steel structure: ~ 3.500 tons
Central Bank Lagos, Nigeria
Engineering, delivery and supervision of steel structure for a Helipad
Glass Roof, Leeds, Great Britain
EGTL – Escravos Gas to Liquid Plant, Nigeria
Layout and workshop engineering, static analysis, delivery and supervision of erection
Building steel structure according to British standard: ~ 500 tons
Cladding: Mineral Sandwich Panels: ~ 10.000 m²
Finishing components: Roller shutter doors, Roof and Wall louvers
Roof Dome Kaohsiung for the World Games 2009, Taiwan
Management and consultant, engineering, static analysis, workshop drawings
Roof dimension: ~ 150 m diameter
Roof steel structure: ~ 2.100 tons supported at cables (⌀ 100mm) and earthquake resistant rubber bearings
Roof Greenpoint Stadium, Cape Town, South Africa
Consultant work, workshop engineering, static analysis for erection, supervision of erection
Stadium capacity of 70.000 people
Roof steel structure : ~ 2.000 tons Supported on radial, - ring cables and an outside compression ring (steel box girder)
Governor's Residence, Uyo, Nigeria
Layout and workshop engineering, static analysis, delivery and supervision of erection
Steel structure for building roofs, crux: ~ 70 tons
Cladding Alu-Kalzip ~ 9.000 m²
Business Center Tinapa, Calabar, Nigeria
Layout and workshop engineering, static analysis, delivery and supervision of erection
Roof steel structure for 52 mall line shops with entertainment building, restaurant: ~ 570 tons, including ~ 110 tons cold rolled purlin
Roof cladding for restaurant, facade, ~ 6.500 m²
International Airport Mongomeyen, Equatorial Guinea
Layout and workshop engineering, static analysis, delivery and supervision of erection
Cladding Alu-Kalzip ~ 8.000 m²
Roof steel structure: ~ 140 tons
Metalwork: ~ 100 tons
Petrol Filling Stations, Dierent Provinces, Nigeria
Engineering and delivery for 30 stations, size 32m x 14m
Roof steel structure : ~ 600 tons
Roof cladding including aluminum attic panels: ~ 14.000 m²
Petrol Terminal Bonny Island, Nigeria
Layout and workshop engineering, static analysis, delivery and supervision of erection
Roof steel structure for 110 houses and schools: ~ 550 tons
Floating Petrol Filling Station
Engineering and delivery for 12 Floating Stations, size 32m x14m
Roof steel structure: ~ 276 tons
Roof cladding: ~ 5.300 m²
Central Park Entrance Gateway, Pylon railway station canopy, Manchester, Great Britain
Quality control and delivery
Bended pipe steel structure: ~ 105 tons, cable supported
German Embassy Madrid, Spain
Engineering, delivery and erection of metalwork
canopies, staircases, facade elements: ~ 50 tons
Telekom Center, Munich, Germany
Layout and workshop engineering, static analysis, delivery and erection
10 Pieces emerceny stairs 50 m high: ~ 275 tons
Mobile car showroom, rst step Davos, Swiss
Engineering and delivery
Steel structure: ~ 60 tons
Dueling Coaster, Yas Island, Abu Dhabi
Erection
800 tons of steel structure, including control and power cable installation
Tower for Roller Coaster, Orlando, USA
Delivery and quality control
Coated steel structure: ~ 110 tons